CIRKUL
Demo · scenario 2 t/h · 470 tonnes a month ·
Tires intercepted
0
this month so far · live
Tonnes processed
0.0
this month so far
CO2e avoided
0
tonnes vs open burning
Outputs by type · tonnes this month
Rubber granules0.058%
Rubber powder0.025%
Recovered steel wire0.017%
Logged in this demo
from the Suppliers tab, counted in the figures above
Carbon-credit basis
Phase 7 · not yet registered
CO2e above is the ledger basis once a registry is chosen
Seeded scenarioNo CIRKUL plant data exists yet. Every figure on this tab runs on the three monthly operating scenarios (1, 2 and 2.5 tonnes an hour) and the assumptions below, plus the demo loads in this browser. The counter ticks at the selected scenario's rate from the first of the month. Real intake entries replace it the day the first load is logged.

Month at this scenario

MeasureFull month
Tires intercepted0
Tonnes processed0
Rubber granules, t0
Rubber powder, t0
Recovered steel wire, t0
CO2e avoided, t0

Assumptions behind the seed

Nothing you enter here leaves this browser.